Installations Nottingham Climbing Centre Indoor climbing spaces are particularly vulnerable to overheating and poor air quality due to the physical activity, high ceilings, and use of chalk. Climbers at this facility had endured uncomfortable summer temperatures and significant dust build-up, both of which affected performance and overall experience. We designed, supplied, and installed a
Installations Gripple – Sheffield, South Yorkshire A busy engineering facility was struggling with high internal temperatures, affecting both staff comfort and productivity. Having already completed two successful projects for this client, our team was once again trusted to design, supply, and install an expanded cooling and ventilation system to meet the demands of their
Installations VEKA – Burnley, Lancashire High production demands at a busy manufacturing site meant internal temperatures regularly rose to uncomfortable levels, particularly during the summer months. On the production line, this created challenges for both staff and machinery efficiency. We designed, supplied, and installed a large-scale ventilation and cooling system to bring temperatures under
Installations Hamilton Schades Labels – Coalville, Leicestershire A busy industrial printing facility faced significant challenges maintaining a comfortable and safe working environment during the summer months. Internal temperatures previously reached nearly 40°C, impacting staff wellbeing and production efficiency. Our team designed, supplied, and installed a tailored cooling solution to stabilise temperatures, enhance airflow, and